![]() |
BEFORE (May) |
AFTER (July) |
One of my favorite contractor f*ck-ups. The plumber placed the new water heater right in the middle of the wall with crazy exposed tubes and pipes all over. Pretty:) Well, I had to grow a pair to deal with "contractors". In the end, they moved it out side and I am grateful.
![]() | ||
August |
And finally September - we could finally stop having to wash dishes in the bath tub :)